nema 23 worm gear
Nema 23 stepper motor with worm gear box
2-phase stepper motor 56mm length 3A 4 lead
Suitable for CNC engraving machines, engraving, milling, lathes
This worm gear stepper motor has an optional gear ratio of 7.5:1, 10:1, 15:1, 20:1, 30:1
Nema3 worm gear stepper motor L6MM 3A gear ratio 7..1 10:1:1 0:1 30:1 CNC router reducer
Package Included :
1 x Nema3 L6mm gear stepper motor
1 x ratio 10:1 gearbox.
specification:
Step angle: 1.8 degrees
Current: 3A
Holding torque: 1.1N.m
Motor length: L6mm
Gear ratio: 7.:1,10:1,:1,0:1,30:1
Product Quick Detail:
- Standard and non-standard available
- With high quality and competitive price
- Prompt delivery
- Packing as per customer’s demand.
We promise will offer the best price by the high quality in china! We also accept special order about the products. If you are interested in our products. Please do not hesitate to let us know.We are pleased to give you the detailed information.We promise that our products would be safety and were in high quality and reasonable price. If you are interested in our products, please contact us asap.We are sincerely looking for your cooperation.
Most of our products are exported to Europe or Americas, both standard and nonstandard products available. We can produce as per your drawing or sample. Material can be standard or as per your special request. If you choose us, you choose reliable.
Materials Available
1. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS420
2. Steel:C45(K1045), C46(K1046),C20
3. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40)
4. Bronze: C51000, C52100, C54400, etc
5. Iron: 1213, 12L14,1215
6. Aluminum: Al6061, Al6063
7.OEM according to your request
Surface Treatment
Annealing, natural canonization, heat treatment, polishing, nickel plating, chrome plating, zinc plating,yellow passivization, gold passivization, satin, Black surface painted etc.
Processing Method
CNC machining, punch,turning, milling, drilling, grinding, broaching, welding and assembly
QC & Certificate
Technicians self-check in production,final-check before package by professional Quality inspector
ISO9001:2008 , ISO14001:2001,ISO/TS 16949:2009
Package & Lead Time
Size: Drawings
Wooden Case/Container and pallet, or as per customized specifications.
15-25days samples. 30-45days offcial order
Port: Shanghai/Ningbo port